Facility Setup

This guide covers how to configure a facility (ARTCC) in Landline, including creating pages, setting facility-wide options, and organizing your position structure.

FE Access Required
The features described in this guide require Facility Engineer (FE) credentials. Contact your ARTCC's technology team for access.

Facility Overview

A facility in Landline represents your ARTCC or organization. Each facility contains:

Accessing Facility Settings

  1. Click the gear icon to open Settings
  2. Click FE Login
  3. Enter your FE credentials
  4. The FE panel opens with administrative options
FE Administration Albuquerque Center (ZAB)
Configuration
Facility
Positions
Pages
Channels
Facility Settings
Configure facility-wide options...

Creating Pages

Pages organize positions into logical groups displayed in the position grid.

Adding a New Page

  1. In the FE panel, select Pages
  2. Click Add Page
  3. Enter the page name (e.g., "High Altitude", "Terminal", "Adjacent")
  4. Set the display order (determines tab order)
  5. Click Save

Page Configuration

Field Description
Name Display name shown on the page tab
Order Numeric order in the tab bar (lower = left)
Visible Whether the page appears for users

Recommended Page Structure

For a typical ARTCC:

Page Size Recommendation
Keep pages to 8-12 positions for optimal usability. If you have more positions, consider splitting into multiple pages.

Facility Settings

Configure facility-wide options in the Facility tab:

General Settings

Setting Description
Facility Name Full name displayed in the application
Facility Code Short code (e.g., "ZAB", "ZLA")
Ring Timeout Seconds before unanswered calls time out (default: 30)
Hold Music Enable/disable music when calls are on hold

Easter Eggs

Fun optional features that can be enabled:

Managing Facility Access

FE Credentials

Each facility can have multiple FE accounts:

Best Practices

Facility Hierarchy

Landline supports connections between facilities for inter-facility communication:

ZAB
Your Facility
ZLA
ZDV
ZFW
Adjacent Facilities

Next Steps

After setting up your facility structure: